TermDefinition
Active days (A)Days of this month inside the flight dates on the campaign's schedule. Weekdays counts Monday to Friday only.
Elapsed days (E)Active days before today, plus the fraction of today that had passed when the data was pulled (if today is an active day). Times use the workspace time zone.
Days leftA - E
BudgetThis month's month plan if set; otherwise the Monthly budget; otherwise the platform daily budget times A (shown as from platform). Month plans include those filled in from Google Ads budget labels and total budgets; see which budget wins.
SpendSpend to date this month, as of the last data pull.

Pacing

Expected = Budget × E / A

What should have been spent by the hour the data was pulled.

Pace = Spend / Expected

100% is on plan. On pace when within 100% plus or minus the tolerance (10% by default).

Projected = Spend / E × A

Month-end spend at the month-to-date run rate. Also the Forecast P50.

Remaining = Budget - Spend
Daily to hit = max(0, Remaining) / Days left

The daily budget that spends exactly what is left by month end.

Most in one day = Daily to hit × platform factor

Factor: Google Ads 2, Microsoft Ads 2, LinkedIn Ads 1.5, TikTok Ads 1.2.

Projected vs budget = Projected - Budget

Positive is overspend; negative is budget left unspent.

Budget change preview = Spend + New daily budget × Days left
P10, P90 = P50 ∓ 1.28 × σ(daily spend) × √(active days left)

σ is the standard deviation of the campaign's daily spend over the last 14 complete days; 30% variation is assumed with fewer than 3 days of history.

Results

Cost per conversion = Spend / Conversions
Forecast conversions = Conversions / E × A
Cost per MQL = Spend / MQLs

MQLs count contacts that reached MQL or a later stage this month.

Cost per SQL = Spend / SQLs
Cost per opportunity = Spend / Opportunities
Pipeline per $1 = Pipeline value / Spend
Average deal size = Pipeline value / Opportunities with an amount
Win rate = Won / (Won + Lost)

Among deals closed in the period.

ROAS = Won revenue / Spend
CAC = Spend / Customers
CAC payback (months) = CAC / (Won revenue / Customers / 12)

Assumes the deal amount is annual revenue.

Google Ads impression share

TermDefinition
Impression shareSearch impressions the campaign received divided by the impressions it was eligible for, as Google Ads reports it.
Lost to budgetShare of eligible search impressions missed because the daily budget was too low (Google Ads search budget lost impression share).
Lost to rankShare of eligible search impressions missed because of Ad Rank: bids, ad quality and landing page (Google Ads search rank lost impression share).

Statuses

On pace, Overpacing, Underpacing, Over budget, Not started, No budget, No data, Paused and Not in flight. See How a status is chosen.

Hover any column header or KPI label in the app to see its definition.

Was this page helpful? If something is missing, unclear or wrong, tell our support team.

Last updated